HPE migration and refresh

From 3PAR, Primera and Nimble to Alletra Storage MP B10000

Most of the risk in a storage project sits in the move, not the box. We plan the data, the hosts, the cutover windows and the rollback before anything is ordered, and we time the refresh to your support dates, so the change is managed from start to finish.

Official HPE partner in the UK

How do you migrate from HPE 3PAR, Primera or Nimble to Alletra Storage MP?

A move to the Alletra Storage MP B10000 runs in four stages. First, inventory what the old array holds: volumes, hosts, protocols, replication and snapshots. Second, design the B10000 and deploy it alongside the old array. Third, move the data in agreed groups, using HPE’s migration tooling or host based methods as each workload allows, with a tested rollback for every group. Fourth, cut over, confirm, and retire the old array.

HPE positions the B10000 as the refresh route for 3PAR, Primera and Nimble all flash arrays that have reached the end of their life. It brings block and file onto one platform, with a 100% data availability guarantee and a StoreMore guarantee of at least 5:1 total savings under HPE’s terms. HPE says that refreshing controllers in place on the new platform saves an average of 30% compared with a traditional forklift upgrade.

Migration and refresh

What we do

Inventory and plan

Everything the old array holds and everything that depends on it, turned into a migration plan with a clear order of work and your support dates built in.

Target design

The B10000 design sized from the data you are moving, with the growth and the block and file services you want on the new platform.

Migration in groups

Workloads moved in agreed groups, with a cutover window and a tested rollback for each, by our people, by HPE’s services team, or by both with your team.

Cutover and retirement

Each group confirmed on the new array before the next begins, replication rebuilt, and the old array retired cleanly.

What you get

Deliverables you can hold us to

We bring the platform, the commercials and the expertise together in one team. Our people spent their careers on the vendor side, building the quotes and negotiating the deals, so we know how enterprise technology is sized, priced and deployed, and we put that to work for you.

Production keeps running, at every stage

Every workload has a plan, a window and a way back before it moves. The refresh lands on your timeline, the old array is retired only when nothing depends on it, and you finish on a platform that grows in small steps from here on.

Talk to us

How it works when you get in touch

  1. Tell us which arrays you are moving from, roughly how much data, and when their support ends.
  2. We build the inventory, design the target and write a migration plan timed to your support dates and change windows.
  3. We move the workloads in groups with your team, confirm each cutover, and retire the old arrays.

We reply within one working day. Prefer email? Write to us at hello@c4cgroup.co.uk.

Prefer email? Write to us at hello@c4cgroup.co.uk.

Questions

HPE migration and refresh: frequently asked questions

Can C4C migrate us from 3PAR to Alletra Storage MP?

Yes. C4C Group plans and delivers migrations from HPE 3PAR, Primera and Nimble onto the Alletra Storage MP B10000, with its own people or alongside HPE’s services team. We inventory the old array, design the target, move the data in agreed groups and confirm each cutover.

What replaces HPE 3PAR, Primera and Nimble?

HPE positions the Alletra Storage MP B10000 as the refresh route for 3PAR, Primera and Nimble all flash arrays. It provides unified block and file storage on a disaggregated, scale out architecture. C4C Group sizes the B10000 from the data on your existing arrays.

Will the migration mean downtime?

It depends on the workload and the method. Many moves can be made with applications online, and others need a short planned window. C4C Group agrees the approach for each group of workloads in advance, with a tested rollback, so any window is planned and as short as it can be.

When should we start planning the refresh?

Well before the support end date. An honest inventory and a migration in sensible groups take time, and starting early keeps every option open. C4C Group’s end of life checker shows where your array sits, and we can turn that into a plan timed to your dates.