Dell migration and refresh

Moving to current Dell storage, with production running throughout

Most of the risk in a storage project sits in the move, not the box. We plan the data, the protocols, the cutover windows and the rollback before anything is ordered, and we time the refresh to your support dates, so the migration is a managed change and never a rushed one.

Official Dell Technologies partner in the UK

How do you migrate from Dell Unity to PowerStore?

A move from Unity to PowerStore runs in four stages. First, inventory what the old array holds: volumes, file systems, hosts, protocols, replication and snapshots. Second, design the target and deploy it alongside the old array. Third, move the data in agreed groups, block and file, using Dell’s migration tools or host based methods as each workload allows, with a tested rollback for every group. Fourth, cut over, confirm, and retire the old array.

Unity is being succeeded by PowerStore, and PowerStore Elite is the current generation, announced in May 2026. Dell’s Future-Proof Program describes built in data migration tools and technology refresh options intended to keep applications online during a move. The same method applies to VNX, Compellent and XtremIO moving to PowerStore, and to Isilon moving to PowerScale. C4C Group plans each migration around your data and your downtime tolerance.

Migration and refresh

What we do

Inventory and plan

Everything the old array holds and everything that depends on it, turned into a migration plan with a clear order of work and your support dates built in.

Target design

The PowerStore or PowerScale design sized from the data you are moving, with the growth and the data services you want on the new platform.

Migration in groups

Workloads moved in agreed groups, with a cutover window and a tested rollback for each, by our people, by Dell professional services, or by both with your team.

Cutover and retirement

Each group confirmed on the new array before the next begins, and the old array retired cleanly once nothing depends on it.

What you get

Deliverables you can hold us to

We bring the platform, the commercials and the expertise together in one team. Our people spent their careers on the vendor side, building the quotes and negotiating the deals, so we know how enterprise technology is sized, priced and deployed, and we put that to work for you.

Production keeps running, at every stage

Every workload has a plan, a window and a way back before it moves. The refresh lands on your timeline, the old array is retired only when nothing depends on it, and the people planning the move are the people who sold and designed these arrays for over a decade.

Talk to us

How it works when you get in touch

  1. Tell us which arrays you are moving from, roughly how much data, and when their support ends.
  2. We build the inventory, design the target and write a migration plan timed to your support dates and change windows.
  3. We move the workloads in groups with your team, confirm each cutover, and retire the old arrays.

We reply within one working day. Prefer email? Write to us at hello@c4cgroup.co.uk.

Prefer email? Write to us at hello@c4cgroup.co.uk.

Questions

Dell migration and refresh: frequently asked questions

Can C4C migrate us from Unity to PowerStore?

Yes. C4C Group plans and delivers migrations from Dell Unity to PowerStore, for block and file workloads, with its own people or alongside Dell professional services. We inventory the old array, design the target, move the data in agreed groups and confirm each cutover before the next begins.

Which older Dell and EMC arrays can you migrate from?

C4C Group migrates from Unity, VNX, Compellent, XtremIO, VMAX and Isilon, among others, onto PowerStore, PowerMax and PowerScale. Our founders sold many of these platforms during more than a decade at EMC, so we know how they behave and what a move off them involves.

Will a storage migration mean downtime?

It depends on the workload and the method. Many moves can be made with applications online, and others need a short planned window. C4C Group agrees the approach for each group of workloads in advance, with a tested rollback, so any window is planned, communicated and as short as it can be.

When should we start planning a refresh?

Well before the support end date. An honest inventory and a migration in sensible groups take time, and starting early keeps every option open. C4C Group’s end of life checker shows where your array sits, and we can turn that into a plan timed to your dates.

Can you migrate from VxRail to external storage?

Yes. C4C Group designs and delivers moves from VxRail and other hyperconverged systems to servers with external storage such as PowerStore. We sold VxRail and Vblock from the vendor side, so we know both architectures well, and we plan the move so workloads stay available throughout.

More Dell services from C4C