VMware migration · Platform selection and delivery

Moving off VMware, onto the platform that fits

Updated 24 November 2026

Decided you are done with VMware? Deciding is the easy part. We assess what you actually run, choose the replacement on your workloads and your numbers, then plan the move and see it through. The platform does not have to be one we sell, and we do not resell VMware licences, so the only thing we are selling is a move that works.

The service

A VMware migration partner with no platform to push

Every platform vendor will tell you theirs is the natural home for your VMware estate. We spent our careers on that side of the table, so we know how those claims are built and which ones hold up on a real workload.

Now we sit on yours. We weigh the established platforms and the newer ones on the same terms, and we tell you where we have a commercial interest before we recommend anything.

How the engagement runs

Assess, choose, move: the three stages

Assess what you actually run

Every workload, what it depends on, and which VMware features it really uses: networking and micro segmentation, vSAN, high availability, disaster recovery, automation. Most estates use far less of the platform than they are licensed for, and that decides which alternatives are realistic.

Choose the platform on evidence

We score the realistic options against your workloads, skills, hardware and budget, and cost each one over three to five years including the move itself. You get a recommendation and the reasoning, not a product pitch. Often the answer is two platforms, not one.

Plan it, prove it, move it

A pilot on real workloads first. Then migration in waves, with a tested way back for each one, backup and disaster recovery rebuilt on the new platform, and your team trained to run it. We deliver with our own people or alongside the platform vendor’s services team.

What you get from us

  • An inventory of your workloads, with the VMware features each one genuinely depends on
  • A platform recommendation with the reasoning, including the options we ruled out and why
  • A three to five year cost model for staying and for each realistic move, on the same basis
  • A migration plan in waves, with a tested way back and a date for each
  • A plan for the last VMware renewal, sized and timed to cover the move and no more

Where VMware migrations go wrong

  • Choosing the platform before counting the workloads. The replacement is picked on a demo, then the awkward ten percent of workloads turn out not to be supported on it.
  • Forgetting what sits around the hypervisor. Backup, disaster recovery, monitoring and security tooling often change with the platform. That cost rarely appears in the first comparison.
  • Assuming the old migration tools still work. Broadcom has removed the VDDK download that many migration and backup tools relied on. Check how the machines will actually be moved before you commit to dates.
  • Letting the renewal date run the project. A move squeezed into the last months before renewal is done badly or not finished, and the renewal is then signed with no leverage at all.

Want the detail first? Read how to migrate off VMware safely and what the VDDK removal means for your migration tooling. When you want it planned properly, talk to us about your migration.

Where you could go

The platforms we assess, partner or not

No platform is a drop in replacement for VMware, and none is right for every estate. These are the ones we weigh for most organisations. We add others where the workload calls for it, and we rule some out early so you do not spend months on a proof of concept that was never going to fit.

Nutanix

The closest to a like for like replacement, with its own migration tooling. A commercial platform with a commercial price. We supply it.

VMware to Nutanix →

Microsoft Hyper-V

The hypervisor many Windows estates already own through Datacenter licensing, on your own servers and storage with no tie to Azure.

Hyper-V assessed →

Microsoft Azure Local

The same hypervisor as a subscription managed through Azure, on validated hardware. The natural route if Azure is where you want to be.

Azure Local assessed →

Proxmox VE

Open source, with paid support if you want it. The most common choice for cost sensitive estates with Linux skills in the team.

Proxmox assessed →

Red Hat OpenShift Virtualization

For organisations already moving to containers, where virtual machines and containers can share one platform.

VMware to OpenShift →

XCP-ng

Open source and built on Xen, with commercial support from Vates. Familiar to anyone who knows vSphere and vCenter.

XCP-ng assessed →

Scale Computing

Small clusters that largely run themselves. A strong fit for branch, retail and edge sites more than the core data centre.

How it compares →

VergeOS

A newer platform from VergeIO that runs compute, storage and networking as one software layer on ordinary servers, including ones you already own.

VergeOS assessed →

Platform9

Private Cloud Director is a managed private cloud built on open source foundations, with a tool that converts existing vSphere clusters.

Platform9 assessed →

We supply Nutanix and Veeam, and say so wherever they are in the running. See all of them side by side in VMware alternatives compared, or ask us which are realistic for your estate.

The last renewal

Leaving usually means one more renewal

Most migrations take longer than the time left on the contract. So the move and the renewal have to be planned together: a short term, sized for the workloads still on VMware, with no penalty for shrinking as you go.

That is a negotiation, and it is one we know well. We negotiated one Fortune 500 company’s Broadcom renewal to 56 percent below the quote. See VMware renewal negotiation.

Timing

When to start

Twelve months or more before the renewal date, if you can. That leaves time to assess the estate, run a pilot and move the first wave before you have to sign anything, and it lets Broadcom see that you can leave. Closer than that? Talk to us anyway. A short bridge and a properly paced move still beat a rushed one.

Planning to leave VMware?

Tell us what you run. We will tell you where it can go.

  1. Tell us about the estate: hosts, cores, what runs on it and when the VMware renewal falls. No need to share the quote. Within one working day we come back with an initial view of which platforms are realistic for you.
  2. We assess the workloads, score the options and cost them properly, including the move. You get a recommendation you can put in front of your board, whether or not you use us for what follows.
  3. We plan and run the migration with your team, and negotiate the last VMware renewal so it covers the move and nothing more.

The platform does not have to be one we sell. Prefer email? Write to us at hello@c4cgroup.co.uk.

Prefer email? Write to us at hello@c4cgroup.co.uk.

Questions

VMware migration: frequently asked questions

Who can help us migrate off VMware?

C4C Group plans and runs VMware migrations for large UK organisations. We assess the estate, choose the replacement platform on your workloads and costs, plan the move in waves and see it through. The platform does not have to be one we sell, and we do not resell VMware licences. Email hello@c4cgroup.co.uk to start.

Which platform should we move to from VMware?

There is no single answer, which is why the choice should follow an assessment rather than a demo. Nutanix is the closest like for like replacement. Azure Local and Hyper-V suit Windows heavy estates. Proxmox VE and XCP-ng are the open source routes. OpenShift Virtualization suits organisations moving to containers. Scale Computing fits edge sites, and newer platforms such as VergeOS and Platform9 are worth weighing. Many estates end up on two.

Do you only recommend platforms you sell?

No. We supply Nutanix and Veeam and say so whenever they are in the running. Most of the platforms we assess we have no commercial tie to. Where we would supply the platform we recommend, we tell you before the recommendation, and you are free to buy it elsewhere.

How long does a VMware migration take?

It depends on your circumstances: the size of the estate, how much sits around the hypervisor, the platform you are moving to and how much change the business can absorb at once. We do not quote a timescale until we have assessed the estate. The assessment and a pilot on real workloads come first, and they are what make the plan and its dates reliable.

What does it cost to leave VMware?

More than the licence comparison suggests, and less than Broadcom would like you to think. The honest figure includes the new platform, any hardware that has to change, migration services and tooling, the period of running both platforms, backup and disaster recovery changes, and retraining. We cost all of it over three to five years, beside the cost of staying, so the two can be compared fairly.

Do we still need to renew VMware if we are leaving?

Usually once more, because most migrations take longer than the time left on the contract. The aim is a short renewal sized for the workloads still on VMware, not another long commitment. We negotiate that bridge as part of the migration, and a credible plan to leave is the strongest position you can negotiate from.

Can we move only part of the estate?

Yes, and it is often the right answer. Workloads that are easy to move go first, which cuts the VMware core count and the renewal with it. Anything tied to a VMware feature, a specialist appliance or an application vendor that only supports vSphere can stay until there is a good reason to move it.

Will our backup and disaster recovery still work?

Not automatically. Backup and disaster recovery are tied to the hypervisor more closely than most teams expect, and support for the newer platforms varies by product. We check this before the platform is chosen, and rebuild and test protection on the new platform before any production workload moves.

Is everyone really leaving VMware?

Most are looking, fewer have gone. A survey carried out for Rimini Street and reported in October 2026 found nine in ten VMware customers weighing alternatives, mostly because of licensing cost. Deciding to leave is the easy part. Choosing the right platform and moving without disruption is where organisations get stuck, and it is the part we do.

What if staying turns out to be cheaper?

Then we say so. Every case is judged on its own numbers, and for some estates the cost and disruption of moving outweigh the increase. In that case the work is not wasted: the assessment and the costed alternative are exactly what you need to negotiate the renewal down.

Still deciding? Read should you leave VMware. Staying for now? VMware renewal negotiation and staying on VMware, done well. Smaller estate? vSphere Express explained. Protecting the move? Veeam for a VMware migration. The survey mentioned above was reported by The Register.